What is Risk Register?

Last updated:

A Risk Register is a living document — usually a spreadsheet — that records each identified risk along with its owner, likelihood, impact, current controls, chosen treatment, and status. It is the central record of an organization's risk assessment and the place auditors look to confirm risks are tracked and managed over time.

Related toolkits: ISO 27001 Complete Toolkit ($99) · NIST CSF 2.0 Complete Toolkit ($79)

A risk register matters because it converts a one-time risk assessment into an ongoing, accountable process. Each risk has a named owner and a status, so nothing falls through the cracks, and management can see at a glance which risks are open, treated, or accepted.

For example, an MSP's register might list "loss of a client backup" with a likelihood, an impact rating, the assigned engineer, the treatment (offsite replication), and a review date — giving an ISO 27001 or SOC 2 auditor direct evidence that the risk is owned and managed.

Building a register from a blank sheet takes work because the hardest parts are the scoring scheme and the column structure that auditors recognize. A pre-built register gives you that framework and the worked examples; you populate it with your real risks and keep it updated. The template structures the record-keeping — staying on top of the entries is what demonstrates active risk management.

Related terms: Risk Assessment · Risk Treatment Plan · AI Risk Management · Internal Audit

Frequently asked questions

Is a risk register the same as a risk assessment?
No. The risk assessment is the process of identifying and evaluating risks; the risk register is the document that records the results and tracks them over time. The assessment produces the register.
Does ISO 27001 require a risk register?
ISO 27001 requires documented risk assessment and risk treatment results, and a risk register is the standard way to satisfy that. The standard does not mandate the exact format, but a register is what auditors expect to review.

Toolkits that cover Risk Register

ISO/IEC 27001:2022

ISO 27001 Complete Toolkit

All 24 policies and procedures plus the risk register, 93-control Statement of Applicability and audit evidence checklist.

NIST CSF 2.0

NIST CSF 2.0 Complete Toolkit

15 editable policies and plans covering all six CSF 2.0 functions, plus a Profile & Assessment workbook with every one of the 106 subcategories, a risk register, and an audit evidence checklist.

SOC 2 Trust Services Criteria

SOC 2 Complete Toolkit

22 policies plus the risk register, a control mapping for the 38 Security, Availability and Confidentiality criteria, and the audit evidence checklist — built for startups facing their first SOC 2.

Learn more in our ISO/IEC 27001 guide, explore the editable policy templates, or browse the full compliance glossary.

Get new templates and guides by email

An occasional email when we publish a new free template, guide, or dataset. Unsubscribe any time.

← Back to the compliance glossary

Professional editable templates — general information only, not legal, audit, tax, or certification advice, and no professional or advisory relationship is created. No purchase makes an organization compliant or certified. Review each document with qualified counsel, your compliance professional, or your auditor before relying on it. ISO, IEC, SOC 2, AICPA, HIPAA, NIST, GDPR, the EU AI Act, IRS and FTC are referenced descriptively only; ComplianceDocs (ExpertEngine LLC) is independent and is not affiliated with, endorsed by, or certified by any standards body, regulator, or audit firm.